31 August 2016
It's the end of the month and the toilets have disappeared! All that is left is a load of bricks and rubble. The demolition is particularity awkward for the contractors because there is so little room on site. After a small amount of demolition the the rubble has to be moved to the front of the site and loaded onto lorries to leave enough room for the next part pf the demolition.